| List of land plots | |
| Cadastral number | Area m2 |
| 59:32:3960006:7404 | 1 309 313 |
| 59:32:3960006:7859 | 93 746 |
| 59:32:3960006:7710 | 221 308 |
| 59:32:3960006:7890 | 58 241 |
| 59:32:3960006:7711 | 18 590 |
| 59:32:3960006:7712 | 17 310 |
| 59:01:4716141:204 | 450 391 |
| 59:01:4716141:40 | 5 109 |
| 59:01:4716141:41 | 280 376 |
| 59:01:4716141:43 | 43 010 |
| 59:01:1717065:53 | 57 802 |
| 59:01:1717065:754 | 66 192 |
| 59:01:1717065:755 | 130 361 |
| List of infrastructure facilities | ||
| Infrastructure facility | Object capacity | Stage of object creation |
| Power supply networks | 48.7 MW | 4.9 MW-the facility was created |
| 43.8 MW — construction and installation works are underway at the facility | ||
| Water supply networks | 1500 m³/h | 250 m3/hr-object created |
| 1,250 m3/h — construction and installation works are underway at the facility | ||
| Wastewater networks | 1500 m³/h | 250 m3/hr-object created |
| 1,250 m3/h — construction and installation works are underway at the facility | ||
| Heat supply networks | 23.2 MW | Infrastructure facilities are under construction |
| Gas supply networks | 20 000 m³/h | |
| On-site road networks | 5.65 km | |
| Telecommunications networks | 5.5 km | |
| List of infrastructure facilities | ||
| Infrastructure facility | Object capacity | Traffic load* |
| Power supply networks | 4.9 MW | 4,08% |
| Water supply networks | 250 m3 / day | 0% |
| Wastewater networks | 250 m3 / day | 0% |
* availability of concluded technical connection agreements and (or) resource supply agreements
| Network type | Capacity under the act of technological connection | Usage for 2025 | Usage share for 2025 |
| Electricity | 1.97 MW | 1,379 MW | 70% |
| Gas supply | 214.5 m3 / h | 160,875 m3 / h | 75% |
| Water supply | 86.4 m3 / day | 56.16 m3 / day | 65% |
| Sewage | 86.4 m3 / day | 56.16 m3 / day | 65% |
The length of the driveways is 830 m (0.83 km).