Information about land plots and infrastructure

Information on land plots located within the boundaries of the Special Economic Zone of industrial and industrial type "Perm" and not leased as of 30.06.2026.

List of land plots
Cadastral number Area m2
59:32:3960006:7404 1 309 313
59:32:3960006:7859 93 746
59:32:3960006:7710 221 308
59:32:3960006:7890 58 241
59:32:3960006:7711 18 590
59:32:3960006:7712 17 310
59:01:4716141:204 450 391
59:01:4716141:40 5 109
59:01:4716141:41 280 376
59:01:4716141:43 43 010
59:01:1717065:53 57 802
59:01:1717065:754 66 192
59:01:1717065:755 130 361

Information on constructed, under construction and planned for construction/reconstruction infrastructure facilities of the Special Economic Zone of industrial and industrial type "Perm" as of 30.06.2026.

List of infrastructure facilities
Infrastructure facility Object capacity Stage of object creation
Power supply networks 48.7 MW 4.9 MW-the facility was created
43.8 MW — construction and installation works are underway at the facility
Water supply networks 1500 m³/h 250 m3/hr-object created
1,250 m3/h — construction and installation works are underway at the facility
Wastewater networks 1500 m³/h 250 m3/hr-object created
1,250 m3/h — construction and installation works are underway at the facility
Heat supply networks 23.2 MW Infrastructure facilities are under construction
Gas supply networks 20 000 m³/h
On-site road networks 5.65 km
Telecommunications networks 5.5 km

Information on the workload of constructed and (or) reconstructed infrastructure facilities of the Perm Special Economic Zone of Industrial and Industrial Type as of 30.06.2026.

List of infrastructure facilities
Infrastructure facility Object capacity Traffic load*
Power supply networks 4.9 MW 4,08%
Water supply networks 250 m3 / day 0%
Wastewater networks 250 m3 / day 0%

* availability of concluded technical connection agreements and (or) resource supply agreements


Information about PSV (Tug)engineering networks

Network type Capacity under the act of technological connection Usage for 2025 Usage share for 2025
Electricity 1.97 MW 1,379 MW 70%
Gas supply 214.5 m3 / h 160,875 m3 / h 75%
Water supply 86.4 m3 / day 56.16 m3 / day 65%
Sewage 86.4 m3 / day 56.16 m3 / day 65%

The length of the driveways is 830 m (0.83 km).