Technical conditions for connection to utility networks are issued by the management company.
The issues of construction permits, commissioning and state expertise are handled by the relevant agencies.
On the territory of the SEZ «Perm» will be built such infrastructure as:
Construction of temporary driveways, water and wastewater connections in the volume of 1500 m3The gas supply in the volume of 20,000 m/day, gas supply in the volume of 20,000 m/day, gas supply in the volume of 20,000 m/day.3/h, heat supply of 1 MW, a temporary electricity connection of 5 MW is scheduled to be completed by the end of 2024.